Longwan Coal-fired Power Plant, Indonesia

Longwan Coal-fired Power Plant, Indonesia


a3bb2b32141e881b9a9685a6bfec02c5.jpg

Before the construction of Longwan Power Plant, Indonesia, man-machine access was not allowed. After the completion of the plant with our core techniques (the Indonesian President visited the plant in person), it was praised by the Central Television Station of Indonesia as “a task considered impossible by many countries, but China's vacuum technique made it possible". During the APEC meeting 2013 in Indonesia, it was praised by CCTV as “an upgraded version of Made in China”.