Padma Bridge Rail Link Project,Bangladesh
Project Profile
Name: Padma Bridge Rail Link Project
Location: Nimtola, Dhaka, Bangladesh
Method: Prefabricated Vertical Drains(PVD)
Construction duration
From: 2019.10
To: 2020.01
Bangladesh Padma Bridge Railway connection project roadbed treatment using prefabricated vertical drains(PVD) construction, the total project volume of 300,000 meters.After treatment, the groundwater discharge effect of subgrade is obvious, which plays an important role in the consolidation of subgrade.