Padma Bridge Rail Link Project,Bangladesh

Padma Bridge Rail Link Project,Bangladesh


Project Profile

Name: Padma Bridge Rail Link Project

Location: Nimtola, Dhaka, Bangladesh

Method: Prefabricated Vertical Drains(PVD)

Construction duration

From: 2019.10

To: 2020.01


Bangladesh Padma Bridge Railway connection project roadbed treatment using prefabricated vertical drains(PVD) construction, the total project volume of 300,000 meters.After treatment, the groundwater discharge effect of subgrade is obvious, which plays an important role in the consolidation of subgrade.